Skip to Navigation

Chris Bernhardt

Bio:

Chris Bernhardt leads IMBA's Trail Solutions program as Director of Consulting Services.

Posted: July 11, 2011 at 9:16:34 AM
By Chris Bernhardt

Fresh off their adventure with the Subaru/IMBA Trail Care Crew, Chris and Leslie Kehmeier have joined the Trail Solutions team.  In doing so they follow in the footsteps of many other Trail Solutions staff who cut their IMBA teeth as a Trail Care... Read More / Post Comments

Posted: July 7, 2011 at 12:08:38 PM
By Chris Bernhardt

Vail Mountain Resort, the fabled destination west of Denver, Colorado, was pummeled with snowstorms this year, resulting in stellar conditions on the slopes.  Not content with a great winter, though, the resort... Read More / Post Comments

Posted: July 5, 2011 at 1:04:41 PM
By Chris Bernhardt

Kids are great product testers: they are unswayed by peer pressure or popular opinion.  The RUSH Trail, a bike-specific flow trail being built in Draper City, Utah, by Trail... Read More / Post Comments

Posted: July 2, 2011 at 10:56:10 PM
By Chris Bernhardt

The Valmont Bike Park in Boulder, Colorado, is the model for community bike park development.  IMBA Trail Solutions, along with Alta Planning + Design and Alpine Bike Parks, designed the facility, with Alpine Bike Parks leading the construction... Read More / Post Comments

Posted: July 1, 2011 at 9:47:35 AM
By Chris Bernhardt

Two IMBA Trail Solutions projects were recently identified in local news outlets.

Punchline Trail Construction (Hailey, Idaho).

... Read More / Post Comments

Syndicate content
X